Wednesday, December 18, 2024

12 Codes of Christmas - Day 8



On the eighth day of Christmas ASME gave to me 
Revisions to occupant evacuation operation inspection per 2.27.6


Minor changes to firefighter emergency operation (FEO) or occupant evacuation operation (OEO) inspections include the addition of 'test' to the list of operations that alert personnel of Phase I activation. Now all 3 operations shall alert personnel of activation.

Additionally, the height of the keyed switch shall be between 36" and 66" above the finished floor.

If you have any questions regarding your specific situation, be sure to contact us.

Click here for a complete list of all changes in the 2022 code.







No comments:

Post a Comment