Last December I walked into a office building that was having
elevator issues. The elevators are
moderately used and consistently had issues.
The elevators where Dover with a card logic system from mid to late 1970’s. The building was looking for a solution. I asked them if they ever thought about
modernizing the elevator system. The
person I was with said, the current vendor never brought that idea up. I said, "what do you think? It is expensive but it will get rid of your nuisance issues with the older equipment". He told me to send him pricing.
We ended up getting the modernization project and replaced
the equipment with Smartrise Controllers, Innovation fixtures, MEI power units
and GAL door operators.
[This was a very tight machine room before modernization]
[New machine room layout gives more room for elevator personnel]
[Car station before]
[Car station after]
[We installed flush mount hall stations and replaced the multi light large Dover P/I directional arrow combo with a combined fixture from Innovation]
I always like seeing the before and after pictures of these
projects to see the contrast of what they looked like before and after. Elevators
are now running great!