In
May of 2002 I made my first sales visit to this building in Park Ridge,
IL. Years later we ended up doing a
modernization on 3 of the elevators and they left one alone as it was newer
than their 1960’s equipment that was in the old part of the building. While newer equipment it was Montgomery
Elevator Miprom equipment which isn’t always everyone’s favorite to work on.
Existing
elevator & project scope – A new owner bought the building and was doing
capital improvements and the non-modernized elevator had a habit of shutting
down on the weekends. This piece of
conveyance equipment was critical in their building traffic pattern and could
not have shut downs. We made a
recommendation to replace this piece of equipment for two reasons; 1st
was the critical nature of this elevator to the building and 2nd was
the amount of technicians who are proficient in Montgomery equipment will be
fewer and fewer as the years go by due to the retirement of domain
knowledge. The new owners agreed and
wanted a completed mechanical and electrical modernization. This was completed on 12 hour days and
delivered early back to the building.
New
equipment providers
Controllers
– Smartrise Engineering
Power
units – MEI
Door
operators – GAL
Fixtures
– Innovation Industries
Elevator machine room– With updated equipment, painted machine room floor and new electrical makes it look a lot better!
[old Machine room]
[old Machine room]
[New Machine room]
[New Machine room]
Hydraulic elevator controller – The original control system was in really poor condition and had a history of getting hot.
[Old crispy MiProm controller]
[New Smartrise Engineering Controller]
Hydraulic elevator
power unit
– The old Montgomery power unit was wearing and experiencing fatigue. It also was leaking a decent amount.
[Old Montgomery dry power unit]
[New MEI power unit with Maxton UC4 Valve]
Door operators – The elevator had MAC
operator and equipment. We replaced the
operator with a GAL MOVFR and retained the MAC hatch equipment was replaced.
[Old MAC operator]
[New GAL MOVFR II operator]
Elevator fixtures – The old Montgomery
fixtures went away and new Innovation flush mount fixtures to meet ADA and
elevator code requirements were installed. I was pretty excited to see how the main
landing turned out with the digital PI to replace the multi light on the right
hand side of the door frame.
[Old Main landing with multi light position indicator]
[New flush mounted buttons & digital position indicator]
[Old Montgomery car station]
[New easier to use Innovation ]
Take away – With how important
this elevator was to the building the modernization was long overdue. Our project team nailed it and brought it in
early. Another great team effort from
signing of contract to engineering to delivery of equipment, project support
and finally field personnel execution.
We also had some help from our Park Ridge Elevator Inspector who made it
out there when we requested it. Thank
you to everyone involved.
Hey! Sign up for our mailing list! We should be getting a
monthly email going out sometime in Q1 of next year.
If
you have any questions or would like additional information feel free to
contact me at CraigZ@colleyelevator.com or
630-766-7230 ext. 107.