Sunday, January 28, 2018

Elevator Modernization – Village of Carpentersville

We recently had the opportunity to partner with the Village of Carpentersville and Morgan Harbor Construction to work on the Village Hall elevator modernization.  The existing elevator was a 1970’s vintage Dover elevator that was constantly having issues with reliability.  The project was bid as a turn key so Colley was the general contractor on the project which also put us in charge of the fire alarm and electrical work.  This was a great team effort, thank you to everyone involved!

Existing equipment

Elevator Controller – Dover w/Cards
Elevator Door operator – Dover
Elevator Power unit – Dover w/Dover I-2 valve
Elevator Fixtures – Dover

New equipment

Elevator Controller – Smartrise
Elevator Door operator – GAL MOVFR w/Dover car and hatch equipment
Elevator Power unit – MEI w/Maxton UC4 valve
Elevator Fixtures – Innovation 
Elevator Car and hatch doors – H & B Elevator

Machine room layout 

[Old Machine room layout]

[New Machine room layout]

[New Smartrise Controller]

Power unit

[Old Dover dry Power Unit with I-2 Valve]

[New MEI submersible Power unit with Maxton UC4 valve]

Door operator & rail guides

 [Old Dover door operator & slide guides]

 [Old Dover door operator & roller guides]

Car, hall fixtures & doors

  [Old Dover car station]

 [New Innovation car station]

 [Old Dover hall station] 

 [New Innovation hall station with digital P/I at each floor - New hatch doors by H & B]


 [Old door with formica & binders]

 [New Stainless steel #4 doors by H & B - gives the car a updated look]

The project was a public bid and the Village saved a considerable amount of money from the other two bidders bids.


As always feel free to contact us at www.colleyelevator.com, email Craigz@colleyelevator.com or call 630-766-7230.