We
recently had the opportunity to partner with the Village of Carpentersville and
Morgan Harbor Construction to work on the Village Hall elevator modernization. The existing elevator was a 1970’s vintage
Dover elevator that was constantly having issues with reliability. The project was bid as a turn key so Colley
was the general contractor on the project which also put us in charge of the fire alarm and electrical work. This was a great team effort, thank you to everyone involved!
Existing
equipment
Elevator Controller
– Dover w/Cards
Elevator Door
operator – Dover
Elevator Power
unit – Dover w/Dover I-2 valve
Elevator Fixtures
– Dover
New
equipment
Elevator Controller
– Smartrise
Elevator Door
operator – GAL MOVFR w/Dover car and hatch equipment
Elevator Power
unit – MEI w/Maxton UC4 valve
Elevator Fixtures
– Innovation
Elevator Car
and hatch doors – H & B Elevator
Machine room layout
[Old Machine room layout]
[New Machine room layout]
[New Smartrise Controller]
Power unit
[Old Dover dry Power Unit with I-2 Valve]
[New MEI submersible Power unit with Maxton UC4 valve]
Door operator & rail guides
[Old Dover door operator & slide guides]
[Old Dover door operator & roller guides]
Car, hall fixtures & doors
[Old Dover car station]
[New Innovation car station]
[Old Dover hall station]
[New Innovation hall station with digital P/I at each floor - New hatch doors by H & B]
[Old door with formica & binders]
[New Stainless steel #4 doors by H & B - gives the car a updated look]
The
project was a public bid and the Village saved a considerable amount of money
from the other two bidders bids.
As
always feel free to contact us at www.colleyelevator.com,
email Craigz@colleyelevator.com or call 630-766-7230.