I
was blown away by the look of the machine room after we completed the elevator
modernization. The final touches took a little bit of extra time but everything turned out very nice.
This was a project where we replaced the controllers, motors, cables, governors, fixtures,
door equipment[including tracks], and installed a fire panel.
This is a project that had more than 12 people work on it from start to finish between selling it, engineering it, delivery, accounting, project management, installation and adjusting. 1 or 2 people do not make a project go well, an entire team makes a project go well. I'm proud to have been one part of this project.
More pictures of the full project to come.
Before
After
If
you have any questions or would like information from Colley Elevator you can
go to www.colleyelevator.com, email Craigz@colleyelevator.com or call 630-766-7230.